Technology Update Reports

On behalf of the IT Services department and in the spirit of transparency and celebration, below are selected highlights of major technology initiatives Information Technology Services (ITS) team and campus partners have accomplished.
Fall 2020 IT Update
Goal 1: Provide an Excellent Customer Experience.    
Campus Partners Project Status
  Between January 1 and September 21st 2020, the IT team:  
  Resolved 2,149 reported incidents with a mean time to repair of 21 hours. By contract, we resolved 2,128 in the entire year of 2019 – and we have 3 months to go.  
  Average satisfaction rating of 4.72 out of 5 in Incident Response surveys  
President’s Office, Conference Services Evaluated several AV systems for use during PSC Board of Trustees meetings and that could be used more broadly across campus Complete
  Hired a replacement PC Technician and Educational Technolgy Complete
Faculty Office Manage a new part-time position – Faculty Technology Liaison Complete
  Updated online and print documentation for self-guided help In-Progress
  To better define our services, revise the IT department’s Service Catalog and present it in a self-service format online In Progress
Conference Services, Student Activities Worked with the college to develop an Audio/Visual support service definition to improve the college’s support services In Progress
  Create a robust inventory process for PSC computer/peripheral technologies to help the college plan for future needs In Progress
Goal 2: Ensure the security, confidentiality, integrity, integration, and availability of all enterprise software applications and systems.    
Campus Partners Project Status
  Updated all of the college’s Windows Server 2008 servers to ensure continued support and security of our systems Complete
IT Advisory Committee, Provost, Executive Cabinet Create an approved and supported comprehensive cyber-security plan for the college Complete
  Upgrade our virtualization software on our data center servers Complete
Admissions, Registrar/IR, Financial Aid Implement a tool to ensure data integrity between our enterprise systems – our first project is to integrate Admissions Data (TargetX) and our Student Information System (Powercampus) using a tool called Axiom Complete
Facilities, Student Affairs Supported the technical implementation of upgrading the college’s magnetic swipe card entry system Complete
  Identify and updated all computer running Windows 7 – Microsoft Support ends January 2020 In Progress
Title IX Coordinator, Campus Safety Review and optimized our Disaster Recovery plan to ensure its effectiveness and compatibility with campus plan In Progress
Provost’s Office Exploring cybersecurity internship opportunities with SUNY Canton In Progress
Campus Safety Establish a cybersecurity playbook to allow us to respond quickly and efficiently to security issues In Progress
Executive Cabinet Create multi-factor authentication policy and plan for implementation In Progress – Policy Approved
  Implement a completely redundant data center allowing more effective disaster recovery solution at ¼ the cost of new data center replacement. In Progress
  Implement a redundant networking for critical network infrastructure for enhanced disaster recovery capabilities at ¼ the cost of new network equipment replacement. In Progress
Goal 3: Advance administrative excellence and operational efficiency through the effective implementation of information technologies.    
Campus Partners Project Status
Financial Aid, Business Office IT helped perform a process review for Financial Aid and Student accounts Complete
  Explored alternative data center options which could lead to significant savings for our data center maintenance and replacement Complete
Business Office Research printer fleet replacement and support vendors and seek approval from the college for purchase Complete -Implementation Planned Winter 2020
Faculty Acquired licenses and implemented and trained users on software for emergency transition to remote work in the spring Complete
  Provided campus with hardware and office configuration changes to work remotely in the spring Complete
HR Supported the migration of ClearCompany to Paylocity for HR Onboarding Complete
Faculty and Staff Develop and implement remote software access for various departments for COVID Complete
Student Affairs Did research on alternatives and costs of cable television contract for the college Complete
  Create metrics utilization reports on campus network (LAN and WAN) Complete
  Presented and received approval for the implementation of Netwrix to track, report and automate identity management tasks and data security on campus. Complete
  Upgraded all network equipment firmware for enhanced reliability, functionality, and security. Complete
Marketing and Admissions Assisted in project development to improve online marketing initiative ROI measurements and reporting. Complete
Financial Aid Upgraded PowerFAIDS financial aid software. Complete
  Researched phone system upgrade/replacement options to see if there are potential savings in ROI. Complete
  Developed and implemented a health screening tracker app and reports to support the health safety of campus. Complete
  Drafted several policies (email, cloud based services) to support the college’s use of technology. Complete
VIC Researched and presented options to provide IT services to campus renters. Complete
VIC Researched and present options to increase bandwidth at the VIC Complete
VIC Performed a wireless strength analysis at the VIC Complete
Human Resources Support the implementation of recruitment and onboarding tool, ClearCompany, for Human Resources In Progress
  Implement a remote monitoring and maintenance solution for classroom technologies (projectors, podiums) In Progress
  Migrate all staff/faculty computers from MS Office Enterprise to MS Office 365 In Progress
Business Office, Facilities Expanding cell phone coverage providers on campus In Progress
Financial Aid, Business Office Assist in establishing connection between Financial Aid PowerFAIDS and Student Information System PowerCampus In Progress
Campus Safety Assisted campus safety to plan the expansion of security cameras on campus. In Progress
Financial Aid Update PowerFAIDS online forms to be compliant In Progress
Goal 4: Advance the academic mission of the college through the effective implementation and support of technologies, resources and services.    
Campus Partners Project Status
Provost Assisted in the development of the Master’s Program Complete
Bookstore Started work with the Bookstore to simplify and improve the college’s textbook ordering process Complete
Title IX, CARE Coordinator Assisted in the creation and implementation of a Chosen Name Policy Complete
CACS Assist CACS on how to implement text message communication in Starfish Complete
AWI Implemented, assisted, and trained AWI in using Canvas to provide remote training for Summer Staff Complete
Faculty Ran and submitted Canvas Data Analysis Reports to Chairs Complete
Faculty Developed and led several Trainings for Faculty Professional Development on using Education Technologies Complete
Faculty, Staff Implemented a pilot followed by campus wide implementation of Zoom for remote instruction supporting COVID Complete
Faculty Researched, ordered, trained and supported emergency spring and fall 2020 educational technologies and equipment to support remote instruction (laptops, webcams, mifi units, etc.) Complete
Library Created a new server to migrate and enhance access to library resources through library proxy services. Complete
Faculty Made configurations changes to allow faculty enhanced access to podium computer features to support instruction. Complete
Faculty Upgraded all public and classroom computer software to latest versions. Complete
Faculty Provided updated just-in-time instructions to faculty for podiums and remote instruction. Complete
Faculty Updated the incoming student computer requirements Complete
President’s Office Assisted in the technology requirements for the virtual graduation ceremony and capstone presentations Complete
Provost, CACS Building on prior success, the college has upgraded Starfish (Early Alert, Connect, and Degree Planner) to the “Guide and Complete” platform, increasing support and tools for advisor analytics, guided pathways, and student self-assessment and career exploration – PSC will be preparing the new system this spring. In Progress – On Hold
Academic and Career Success, Provost, Faculty Support the optimization of the use of Starfish for student success – meeting planning and advising for Advisors, CACS, TRIO, CAS, HEOP and other support office, and onboarding freshman advising In Progress – CACS, CAS, TRIO and Advising Complete
Provost, Faculty Support the growth of online learning and instructional design through professional development opportunities In Progress 19-20AY – New Goals Created
Faculty Support the creation of high quality educational offerings through Canvas and other technologies In Progress 19-20AY – New Goals Created
Faculty Make Pickett 110 available 24/7 to students. In Progress
Spring 2020 IT Update - 2/24/2020
Goal 1: Provide an Excellent Customer Experience.    
Campus Partners Project Status
  Between July 1st and September 1st 2019, the IT team:  
  Resolved 1,322 reported incidents with a mean time to repair of 21 hours.  
  Average satisfaction rating of 4.94 out of 5 in Incident Response surveys  
Faculty, Facilities Worked with faculty to propose making Pickett available as a 24/7 computer lab Complete
  Implemented a remote password reset option for Office 365 Complete
  To better define our services, revise the IT department’s Service Catalog and present it in a self-service format online In Progress
Conference Services, Student Activities Worked with the college to develop an Audio/Visual support service definition to improve the college’s support services In Progress
President’s Office, Conference Services Evaluated several AV systems for use during PSC Board of Trustees meetings and that could be used more broadly across campus In Progress
  Create a robust inventory process for PSC computer/peripheral technologies to help the college plan for future needs In Progress
Goal 2: Ensure the security, confidentiality, integrity, integration, and availability of all enterprise software applications and systems.    
Campus Partners Project Status
  Rename campus computers according to standardized naming convention, allowing better more efficient customer service and computer management Complete
  Align our identity and asset management system (Microsoft Group Policy) with established best practices Complete
  Evaluated and proposed a risk assessment and auditing software tool to improve the college cybersecurity posture Complete
  Updated our network equipment’s firmware to improve security and reliability Complete
  Replaced our network and server monitoring tool with a lower cost open source software suite Complete
  Performed critical updates to the college’s network firewall Complete
Library Assisted the library in updating and migrating their library software systems Complete
  Updated all of the college’s Windows Server 2008 servers to ensure continued support and security of our systems In Progress
IT Advisory Committee, Provost, Executive Cabinet Create an approved and supported comprehensive cyber-security plan for the college In Progress
  Upgrade our virtualization software on our data center servers In Progress
  Identify and updated all computer running Windows 7 – Microsoft Support ends January 2020 In Progress
Title IX Coordinator, Campus Safety Review and optimized our Disaster Recovery plan to ensure its effectiveness and compatibility with campus plan In Progress
Provost’s Office Exploring cybersecurity internship opportunities with SUNY Canton In Progress
Campus Safety Establish a cybersecurity playbook to allow us to respond quickly and efficiently to security issues In Progress
Admissions, Registrar/IR, Financial Aid Implement a tool to ensure data integrity between our enterprise systems – our first project is to integrate Admissions Data (TargetX) and our Student Information System (Powercampus) using a tool called Axiom In Progress –  99% complete – Testing Phase
Executive Cabinet Create multi-factor authentication policy and plan for implementation In Progress – Policy Approved
Goal 3: Advance administrative excellence and operational efficiency through the effective implementation of information technologies.    
Campus Partners Project Status
Business Office Research and Review existing telecommunications vendor agreements and seek opportunities to right size, improve, and save costs Complete
  Create a software/project evaluation rubric and process for new high cost systems Complete
  Increase productivity of IT Services project management through the use of technology – Adopted ClickUp for Library and IT Complete
Business Office, ADK Health Explored technology partnerships with ADK Health to find mutual benefits Complete
Student Affairs Researched and reviewed existing and alternative options for cable television and presented them to student affairs for further consideration Complete
Facilities Assisted in exploring upgrade options for electronic door access for campus spaces Complete
Financial Aid Assisted in departmental adoption of DocStar for electronic document scanning and access Complete
Human Resources Support the implementation of recruitment and onboarding tool, ClearCompany, for Human Resources In Progress
  Implement a remote monitoring and maintenance solution for classroom technologies (projectors, podiums) In Progress
  Migrate all staff/faculty computers from MS Office Enterprise to MS Office 365 In Progress
Business Office, Facilities Expanding cell phone coverage providers on campus In Progress
Financial Aid, Business Office Assist in establishing connection between Financial Aid PowerFAIDS and Student Information System PowerCampus In Progress
Financial Aid, Business Office IT helped perform a process review for Financial Aid and Student accounts In Progress
  Explored alternative data center options which could lead to significant savings for our data center maintenance and replacement In Progress
Business Office Research printer fleet replacement and support vendors and seek approval from the college for purchase In Progress – Spring 2020
Goal 4: Advance the academic mission of the college through the effective implementation and support of technologies, resources and services.    
Campus Partners Project Status
Academics Created pre-populated Outlook Calendar files for each faculty to import into their calendars Complete
Provost, Faculty, CAS Perform a campus wide assessment of all learning spaces with a cross divisional team Complete
Provost Performed a comparison of online course evaluation tools Complete
Provost, Facilities, Athletics Assisted in the implementation of the college’s new eSports lab space Complete
Faculty, Registrar, Academic and Career Success Enhance advising by implementing a fully functional Degree Planner tool Complete – Supporting Academic Goals
Provost, Library Assist in development of information and digital literacy standards and services to support the academic mission of the college In Progress
Provost, CACS Building on prior success, the college has upgraded Starfish (Early Alert, Connect, and Degree Planner) to the “Guide and Complete” platform, increasing support and tools for advisor analytics, guided pathways, and student self-assessment and career exploration – PSC will be preparing the new system this spring. In Progress
Provost Assisted in the development of the Master’s Program In Progress
Bookstore Started work with the Bookstore to simplify and improve the college’s textbook ordering process In Progress
Title IX, CARE Coordinator Assisted in the creation and implementation of a Chosen Name Policy In Progress
Academic and Career Success, Provost, Faculty Support the optimization of the use of Starfish for student success – meeting planning and advising for Advisors, CACS, TRIO, CAS, HEOP and other support office, and onboarding freshman advising In Progress – CACS, CAS, TRIO and Advising Complete
Provost, Faculty Support the growth of online learning and instructional design through professional development opportunities In Progress 19-20AY – New Goals Created
Faculty Support the creation of high quality educational offerings through Canvas and other technologies In Progress 19-20AY – New Goals Created
Fall 2019 IT Update -9/17/2019
Goal 1: Provide an Excellent Customer Experience    
Campus Partners Project Status
  Between January 1st and September 1st 2019, the IT team:  
  ·         Resolved 1151 reported incidents with a mean time to repair of 21 hours.  
  ·         Answered 1521 phone calls  
  ·         Responded to 1721 emails  
  ·         Helped 702 walk-in customers  
  Average satisfaction rating of 4.78 out of 5 in Incident Response surveys  
  86% of students report satisfied or very satisfied with IT Services Helpdesk (MISO Survey Spring 2019)  
Faculty Create additional on-demand help documentation for podium technologies in learning spaces Complete
  Streamline ability to assist users remotely to more quickly resolve their issues Complete
  Create on-demand documentation for top 5 FAQ requests to the ITS Department Complete
  Upgrade and enhance IT incident management software to be more customer friendly and efficient Complete
  Our helpdesk software asks you via email for feedback after we close a ticket – help us to improve our services! Complete
  Create and maintain a vendor software catalog to track all college enterprise software systems Complete
  Establish performance Key Performance Indicators (KPI’s) for the helpdesk to ensure service quality Complete
  To better define our services, revise the IT department’s Service Catalog and present it in a self-service format online In Progress
Faculty, Establish a new student job role – Technology Services Digital Literacy Trainer Piloting Spring 2019 – On Hold 19-20AY
Academic Support Services    
  Implement a remote password reset option for PSC users In Progress
Campus Safety, Work with student onboarding to get student photos into enterprise systems To Do
Admissions,    
Registrar,    
IR  
Goal 2: Ensure the security, confidentiality, integrity, integration, and availability of all enterprise software applications and systems.    
Campus Partners Project Status
  Implement an automated live monitoring tool to track server status’ and provide alerts Complete
  Upgrade server hardware and migrated enterprise data center backup software Complete
  Implement a logging management service to better track, notify and inform IT of issues with our enterprise systems Complete
Student Affairs Install 60 new wireless access points in dorm rooms Complete
  Increase security of wireless network by offering unsecure and secure connections Complete
  Offer 2G and 5G wireless split band options to improve utilization and performance of wireless network Complete
  Improve critical network configurations that should increase campus wide network performance Complete
Student Affairs Remove underutilized copper phone line service from dorm rooms to decrease maintenance costs Complete
  Replace problematic networking equipment in the student center Complete
  Performed security audit and hardening to the college’s enterprise servers Complete
  Upgrade Antivirus software on our data center servers Complete
Facilities/SLIC (3rd party) Upgrade our campus network fiber infrastructure through a partnership with SLIC = more reliable, consistent and faster network connections Complete – Small Portion of Campus requires construction investment for finalization
Registrar, With established cross functional team, assess the impact, cost, and priority of upgrading PowerCampus Complete – Project on Hold
Student Accounts,    
Campus Advocacy and Response Education    
IT Advisory Committee, Create an approved and supported comprehensive cyber-security plan for the college In Progress
Provost,    
Executive Cabinet    
  Rename campus computers according to standardized naming convention, allowing better more efficient customer service and computer management In Progress
  Upgrade our virtualization software on our data center servers In Progress
Admissions, Registrar/IR, Implement a tool to ensure data integrity between our enterprise systems – our first project is to integrate Admissions Data (TargetX) and our Student Information System (Powercampus) using a tool called Axiom In Progress –  95% complete – Testing Phase
Financial Aid    
Executive Cabinet Create multi-factor authentication policy and plan for implementation In Progress – Policy Approved
  Align our identity and asset management system (Microsoft Group Policy) with established best practices In Progress
  Identify and updated all computer running Windows 7 – Microsoft Support ends January 2020 In Progress
Title 9 Coordinator, Review and optimized our Disaster Recovery plan to ensure its effectiveness and compatibility with campus plan In Progress
Campus Safety  
Goal 3: Advance administrative excellence and operational efficiency through the effective implementation of information technologies.    
Campus Partners Project Status
Business Office, In support of electronic document management, assist with the upgrade of Docstar software which is used by the business office to digitize paper documents. Complete
HR    
Financial Aid Create and maintain a test server for our enterprise financial aid office Complete
  Evaluate demos from alternative computer vendors to ensure we getting the maximum value for new purchases Complete
  Create a maintenance calendar for all IT maintenance operations Complete
Business Office Research printer fleet replacement and support vendors and seek approval from the college for purchase Complete
  Advise College Advancement on CRM Update/Acquisitions and billing Complete
Business Office Research and Review existing telecommunications vendor agreements and seek opportunities to right size, improve, and save costs. In Progress
Human Resources Support the implementation of recruitment and onboarding tool, ClearCompany, for Human Resources In Progress
  Create a software/project evaluation rubric and process for new high cost systems In Progress
  Implement a remote monitoring and maintenance solution for classroom technologies (projectors, podiums) In Progress
  Migrate all staff/faculty computers from MS Office Enterprise to MS Office 365 In Progress
Business Office Expanding cell phone coverage providers on campus In Progress
Facilities    
  Increase productivity of IT Services project management through the use of technology In Progress
Financial Aid, Explore next steps in having a supported connection between Financial Aid PowerFAIDS and Student Information System PowerCampus On Hold
Business Office  
Goal 4: Advance the academic mission of the college through the effective implementation and support of technologies, resources and services.    
Campus Partners Project Status
Provost, Provided educational professional development opportunities for the faculty and staff at Provost’s Day and other events Complete
Faculty    
Academic and Career Success Migrate Center for Academic and Career Success from AccuSQL to Starfish in support of tutoring services Complete
Provost, Created LMS Learning Tools Interoperability policy for Canvas to streamline the user experience Complete
Faculty    
Provost, Identify and select software for improving PSC’s ability to communicate campus events, track engagement, and offer micro-credentialing services Complete
VP Student Affairs    
Advancement, Academics Worked with Culinary and Advancement Offices to get preliminary IT cost data for the Corporate Relations/Enrollment Development initiatives Complete
Academic and Career Success Transitioned software to a new platform for career services GradLeaders tool Complete
Academics Created pre-populated Outlook Calendar files for each faculty to import into their calendars Complete
Academics Upgraded the podium in the Adirondack room to be more BYOD friendly Complete
Academic and Career Success, Support the optimization of the use of Starfish for student success – meeting planning and advising for Advisors, CACS, TRIO, CAS, HEOP and other support office, and onboarding freshman advising In Progress – CACS, CAS, TRIO and Advising Complete
Provost,    
Faculty    
Provost, Support the growth of online learning and instructional design through professional development opportunities Complete 18-19AY and In Progress 19-20AY
Faculty    
Faculty, Enhance advising by implementing a fully functional Degree Planner tool In Progress – Registrar Building Plans for 19-20AY
Registrar,    
Academic and Career Success    
     
Provost Perform a campus wide assessment of all learning spaces with a cross divisional team In Progress
Provost, Establish information and digital literacy standards and services to support the academic mission of the college In Progress
Library    
Faculty Support the creation of high quality educational offerings through Canvas and other technologies In Progress – Professional Development of Instructional Design
Spring 2019 IT Update - 2/7/2019
Goal 1: Provide an Excellent Customer Experience    
Project Status Campus Partners
Between August 1st and December 31st 2018, the IT team:    
·         Resolved 853 reported incidents with a mean time to repair of 21 hours.    
·         Answered 993 phone calls    
·         Responded to 932 emails    
·         Helped 623 walk-in customers    
Created on-demand help documentation for podium technologies in learning spaces Complete Faculty
To better define our services, revise the IT department’s Service Catalog and present it in a self-service format online In Process  
Establish a new student job role – Technology Services Digital Literacy Trainer Piloting Spring 2019 Faculty, Academic Support Services
Establish performance Key Performance Indicators (KPI’s) for the helpdesk to ensure service quality In Process  
Work with student onboarding to get student photos into enterprise systems To Do Campus Safety, Admissions, Registrar, IR
Goal 2: Ensure the security, confidentiality, integrity, integration, and availability of all enterprise software applications and systems.    
Project Status Campus Partners
Upgraded policies to improve security and process improvement – Clean Desk Policy, Password Policy Complete Provost’s Office/Cabinet
Performed a security audit of high priority technology assets Complete  
Implemented a multi-layer security entry point for all critical servers to prevent unwanted access Complete  
Performed an emergency upgrade to Powercampus Complete Registrar, Business Office
Performed a data center migration cost/benefit analysis on cloud based services Complete  
Performed research and cost/benefit analysis for Single Sign On solutions Complete  
Upgrade our virtualization software on our data center servers In Process  
Implement an automated live monitoring tool to track server status’ and provide alerts In Process  
Create an approved and supported comprehensive cyber-security plan for the college In Process IT Advisory Committee/Provost’s Office
Upgrade AntiVirus software on our data center servers In Process – 95% complete  
Implement a tool to ensure data integrity between our enterprise systems – our first project is to integrate Admissions Data (TargetX) and our Student Information System (Powercampus) using a tool called Axiom In Process – Testing Phase Admissions, Registrar/IR, Financial Aid
Upgrade our campus network fiber infrastructure through a partnership with SLIC = more reliable, consistent and faster network connections In Process – South Campus Complete Facilities/SLIC (3rd party)
Research multi-factor authentication solutions to increase security to enterprise email In Process – Final Testing Phase  
Align our identity and asset management system (Microsoft Group Policy) with established best practices In Process  
Performed security audit and hardening to the college’s enterprise servers In Process  
Implement a logging management service to better track, notify and inform us of issues with our enterprise systems In Process  
Rename campus computers according to standardized naming convention, allowing better more efficient customer service and computer management In Process
Goal 3: Advance administrative excellence and operational efficiency through the effective implementation of information technologies.    
Project Status Campus Partners
Automated Microsoft Licensing through the implementation of Microsoft KMS Server Complete  
IT department’s Strategic Plan draft approved by IT Advisory Committee Complete IT Advisory Committee
Analyzed our phone records to determine if we can reduce costs by reducing the number of door that have traditional copper phone line service Complete Residence Life
Migrated and upgraded Extract/Transform/Load software (Veera) used for campus data migrations/reporting Complete Registrar
Provided software vetting and recommendations for campus software FrontRush to support athletics recruitment efforts Complete Athletics, Admissions
In support of electronic document management, assist with the upgrade of Docstar software which is used by the business office to digitize paper documents. In Process Business Office, HR
Research printer fleet replacement and support vendors and seek approval from the college for purchase In Process Business Office
Research and Review existing telecommunications vendor agreements and seek opportunities to right size, improve, and save costs. In Process Business Office
Provide Professional Development on office productivity tools for Marketing Department In Process Marketing Department
Work with Student Affairs to research and vet software applications to improve student experience and operational efficiency In Process Student Affairs
Upgrade printer fleet To Do  
Explore next steps in having a supported connection between Financial Aid PowerFAIDS and Student Information System PowerCampus To Do Financial Aid, Business Office
Goal 4: Advance the academic mission of the college through the effective implementation and support of technologies, resources and services.    
Project Status Campus Partners
Create and pass policies regarding LMS usage and permissions Complete Provost’s Office
Support the upgrade the library’s capstone database to increase security and functionality of the system. Complete Library
Support the Academic and Career Success department in the migration of career center software – AccuSQL and GradLeaders Complete Academic and Career Success
Research cable television options and work with Student Affairs to determine best service levels and costs Complete Student Affairs
Work with the Provost’s Office and faculty to support the pilot and implementation of online course evaluations Complete Provost’s Office, Faculty
Assist the Provost’s and Business Offices with grant applications for learning space renovations and upgrades Complete Provost’s Office, Business Office
Assisted Provost’s Office in locating vendors to assist PSC with academic strategy Complete Provost’s Office, Admissions
Provided educational professional development opportunities for the faculty and staff at Provost’s Day Complete Provost’s Office
Support academic support services (TRIO, HEOP, CASC, CAS) in piloting and implementing Starfish Kiosk to better manage walk-ins and meetings with students In Process – CAS CAS, TRIO, HEOP, CASC
Work with the faculty and facilities in two major Freer Renovation plans In Process Facilities, College Advancement, Faculty
Work with the Provost’s Office to create comprehensive classroom plan for the college In Process – Learning Space Committee Formed and Working Provost’s Office, Faculty, Staff
Enhance advising by implement a fully functional Degree Planner tool In Process – Beta Launch Jan 2018 Faculty, Academic and Career Success
Working with the Library and Provost’s Office, establish information and digital literacy standards and services to support the academic mission of the college In Process Provost’s Office, Library
Support the growth of online learning and instructional design through professional development opportunities In Process Provost’s Office
Fall 2018 IT Update - 10/5/2018
One of the major initiatives that I think will have lasting impact is the creation of the IT Advisory Committee whose charge, simply, is to help the college set strategic priorities for technology on campus. This committee will help drive the priorities of the ITS department and will allow the department’s projects and tasks to have the maximum impact for the college.

Goal 1: Provide an Excellent Customer Experience    
Project Status Campus Partners
From January 1st to September 1st the IT team has: Ongoing  
·         Resolved 1395 reported incidents with a mean time to repair of 19 hours.    
·         Answered additional phone calls, walk-ins and emails    
Further refined and improved our helpdesk operations processes. Complete  
Assisted the SOAR team in technology account creation and education during summer SOAR days. Complete Student Affairs, Academic and Career Success
Hire and Instructional and Enterprise Technologist to support campus needs – Welcome Ian! Complete  
Researched Computer Vendor Agreements to simplify student computer purchasing. Complete  
To better define our services, revise the IT department’s Service Catalog and present it in a self-service format online. In Process  
Establish performance Key Performance Indicators (KPI’s) for the helpdesk to ensure service quality. To Do  
Work with student onboarding to get student photos into enterprise systems. To Do Campus Safety, Admissions, Registrar, IR
Goal 2: Ensure the security, confidentiality, integrity, integration, and availability of all enterprise software applications and systems.    
Project Status Campus Partners
Upgraded our primary bandwidth from a 700Mbit to 1000Mbit and changed internet service providers to take advantage of cost savings. Complete  
Performed Network and Server Security upgrades to harden our systems. Complete  
Upgraded and migrated servers and software for the Academic Success and Career Center, Registrar/IR, and Financial Aid departments. Complete Academic and Career Success, Registrar/IR, and Financial Aid
Implement an automated monitoring tool to track network status’ and provide alerts. Complete  
Replace aging Version 1 network access points in all buildings. Complete Facilities, Registrar
Implement a password security vault for technology management accounts. Complete  
Updated our server RAM capacity to meet enterprise software demands. Complete  
Upgrade policies to improve security and process improvement – Clean Desk Policy, Password Policy. In Process Provost’s Office/Cabinet
Implement an automated monitoring tool to track server status’ and provide alerts. In Process  
Create an approved and supported comprehensive cyber-security plan for the college. In Process  
Upgrade AntiVirus software on our data center servers. In Process  
Upgrade our virtualization software on our data center servers. In Process  
Implement a tool to ensure data integrity between our enterprise systems – our first project is to integrate Admissions Data (TargetX) and our Student Information System (Powercampus) using a tool called Axiom. In Process Admissions, Registrar/IR, Financial Aid
Upgrade our campus network fiber infrastructure through a partnership with SLIC. In Process  
Research 2-factor authentication solutions to increase security to enterprise systems. In Process
Goal 3: Advance administrative excellence and operational efficiency through the effective implementation of information technologies.    
Project Status Campus Partners
Advised and project managed the Bookstore and Marketing Department on exploring a POS solution for the bookstore. Complete Marketing, Bookstore
Created and IT Advisory Committee designed to allow campus input on how to best utilize IT Services to advance the college’s mission. Complete Faculty, Staff, Provost, VP Finance and Administration
Purchased new computers according to the college’s computer replacement policy – we will be distributing them this fall and winter. Complete Chair’s Council
Assist health and counseling services to implement an Electronic Medical Records system. Complete Health Services, Counseling Center
Assist administrative offices in transitioning between video conferencing solutions, GoToMeeting to Zoom. Complete President’s and Provost’s Offices
Upgraded IT Helpdesk incident management software. Complete  
Automating Microsoft Licensing through the implementation of Microsoft KMS Server. In Process  
Get approval for the IT department’s Strategic Plan draft. In Process IT Advisory Committee
In support of electronic document management, support the upgrade of Docstar software which is used by the business office to digitize paper documents. In Process Business Office, HR
Analyze our phone records to determine if we can reduce costs by reducing the number of door that have traditional copper phone line service. In Process Residence Life
Goal 4: Advance the academic mission of the college through the effective implementation and support of technologies, resources and services.    
Project Status Campus Partners
Implemented Mobility Print, enabling PSC community users to print from their mobile devices. Complete  
Upgraded Picket, Cantwell, and Freer classroom podiums, creating an easy to use and consistent teaching environment that supports Bring Your Own Device. Complete Facilities, Faculty
Project managed the acquisition, pilot, implementation and launch of Canvas, the college’s new LMS to support teaching, learning, and distance education. Complete Faculty
Work with the library to implement a pilot of a digital signage room scheduling tool call JOAN. Complete Library
Enhance advising by implement a fully functional Degree Planner tool. In Process Faculty, Academic and Career Success
Support the Academic and Career Success department in the migration of career center software – AccuSQL and GradLeaders. In Process Academic and Career Success
Working with facilities and the Provost’s Office, expand power options in classrooms. In Process Provost’s Office
Work with the faculty and facilities in two major Freer Renovation plans. In Process Facilities, College Advancement, Faculty
Create and pass policies regarding LMS usage and permissions. In Process Provost’s Office
Support the upgrade the library’s capstone database to increase security and functionality of the system. In Process Library
Work with the Provost’s Office to create comprehensive classroom plan for the college. To Do Provost’s Office
Spring 2018 IT Update - 2/5/2018
Provide Excellent Customer Service
In 2017, the IT team:
• Resolved 2,469 reported incidents
• Answered 2,313 phone calls
• Responded to 4,504 emails
• Helped 1,353 walk-in customers

Over that time, we have received more service requests from the campus and have decreased the time it has taken to complete fixes (from 41 hours in spring 2017 to 30 hours in fall 2017). Anecdotally, I have been hearing positive feedback on the customer service you have been receiving. IT will continue to streamline and improve this area of service for you.

In alignment with the college’s strategic plan goal of ensuring “campus infrastructure is reliable, secure and adequately meets campus needs”:
• Data Center:
o We continue to implement updates and configuration changes to harden the security of our data center servers by creating firewall rules on servers to only allow specific protocols to connect to applications on the servers.
o We implemented best practice automated technologies to automatically “snapshot” our services periodically, allowing us to easily roll them back to previous points in time as might be needed in the case of an emergency.
o In order to continue to provide secure and functional file sharing services to campus, we migrated our file shares (P Drive, G Drive, U Drive, etc.) to a new updated version of Windows server.
• Networking:
o In an effort to provide excellent internet and network services to our students in dorms and classrooms, we conducted a survey on student satisfaction of their wireless internet experiences and continue to tweak network configurations to improve their experience. Overall, we have received a drop-in network related incidents and have partnered with Student Affairs to let us know if they hear issues from students so we can respond promptly.
o We continued implementing updates and configuration changes to harden the security of our network to keep threats at bay.
o We conducted a “Phishing” test, and subsequent emails and a lightning talk, to educate end users on the best practices to help secure our accounts and systems.
• Data Strategies
o The IT department is partnering with the Registrar’s office and Admissions department to provide resources and advice to better integrate the data in our enterprise systems and streamline employee and potential student workflows.

In support of the College’s strategic plan goal of providing inspired learning and “Implementing systems that will support both on-campus and remote activities”:
• After an extensive selection process, the college had decided to pilot a new Learning Management System to replace Moodle. Canvas was chosen as the final vendor and roughly 15 faculty and staff are using the software this spring in courses. Canvas will provide current, easy to use, ubiquitous access and allow for a variety of delivery modes to meet the needs of our faculty and students. This project also has the potential to improve retention and student success.
• To improve student success through improved advising, after an extensive selection process the college had partnered with Hobsons to provide a Starfish Degree Planner, an academic planning module of the Starfish platform that makes it possible for us to efficiently provide each student with a proactive, personalized, step-by-step roadmap to the finish line, even as their goals and circumstances change. This product is expected to go live at PSC in Fall 2018.
• The IT department has provided a way for faculty, staff and students to securely, and remotely, access their campus files on the network via a webpage at https://webfiles.paulsmiths.edu/htcomnet/

Adding Valuable Services for Students, Faculty and Staff.
• Upgraded computer labs with new projectors and lighting – With improved wireless services complete, the IT department has completed phase 1 of improving classroom technologies – we installed new, brighter projectors and adjusted the lighting in Pickett, Cantwell and Freer classrooms. Phase 2 will include assessing the need for the remaining classrooms and upgrading the podium equipment to create a common experience for teachers and students, enabling them to bring their own devices to project to the screens.
• Updated our website and online on-demand documentation for our most frequently asked questions.
• In support of the BYOD (Bring Your Own Device) student initiative, we are researching options to provide incoming students with consistent and compatible computer hardware options for purchase through our vendors.
• To improve and support the campus BYOD initiative, we are almost complete with a project that will enable campus faculty, staff and students to print to our printers using their own devices (Windows, MacOS, iOS, Android). More information to come soon!
• We have renamed some of our printers on campus to make them easier to identify.
• We have created a “Phone-A-Thon” in a box – a mobile set of preconfigured phones, laptops, and networking equipment that can provide phone and computing services anywhere on campus and can be set up and torn down quickly and easily. College Advancement will be responsible for the equipment, but the “Phone-A-Thon in a box” can be used to support any of our future campus business needs that require a phone center environment.
• Partnering with the Student Affairs department, we met with the RA’s to provide training to help field technology questions and issues that may arise with students.
• We checked all of the dorms and classroom spaces prior to the start of the spring semester to ensure everything was working well.
• The IT department has been streamlining the user creation process in our systems to ensure that new students, faculty and staff will have a positive onboarding experience.

Fall 2017 IT Update - 9/6/2017
Provide Excellent Customer Service
Since January 1st, the IT team has:
• Resolved 1430 reported incidents
• Answered an estimated 1435 phone calls
• Responded to an estimated 2800 emails
• Helped an estimated 800 walk-in customers

• This past Spring we implemented a new training program for our student workers – this program allows them to improve their technology and customer service skills making them more marketable for their post-PSC careers and allow them to deliver great service to our PSC community.
• One of our goals this fall is the improve the operations of our help desk services. We plan on implementing changes in our processes and procedures to better align with best practices in IT.

Mitigate Risk and Improve Network, Systems, and Data Security
• Data Center:
o Our data center has now been backed up to the cloud and we have the ability to, in the event of a disaster, continue our technological business operations by running our servers on cloud based infrastructure.
o Installed a smaller, cheaper, more efficient Uninterruptible Power Supply (UPS) with greater capabilities to replace our 15 year old unit. We are currently installing software on our server to allow for safe shutdowns in the event of a server room power outage.
• Networking:
o Installing Uninterruptible Power Supplies (UPS) in all of our switch closets around campus to ensure as much continuity of service as possible for our network and internet services.
o Changed our network configurations to provide users with an easier wireless experience – all of campus will now see “PSC Wifi” as their main wireless connection point. Dorm room access points have been incorporated into this naming scheme.
o The college signed an agreement with SLIC Network Solutions to obtain improvements to our fiber optic network at no cost to the College in exchange for providing bandwidth to SLIC for its seasonal customers.
o Implementing updates and configuration changes to harden the network. We have been conducting network penetration testing to find vulnerabilities. Though done informally at this point, the IT team has been sending out educational notices to the campus community warning them of popular security best practices.

• Systems, Software, Data and Operations:
o Organized some of our Identity Management Services (Active Directory) – These services provide permissions (username and password authentication) to many of our technology services and they were in desperate need to being updated. This project was significant and required a lot of time, energy, expertise, planning and collaboration. Our partnerships with other departments including the Provosts Office, Human Resources, Admissions, College Advancement, the Registrar and the Academic Success Center have helped us get started at putting in place processes to keep these lists accurate and up to date, allowing us to provide consistent, secure and well managed services now and into the future.
o Provided business analyst services to the Provost’s Office for several enterprise software systems in consideration for purchase.
o Drafted new policies and procedures for the department to increase transparency and improve operational efficiency.

Adding Valuable Services for Students, Faculty and Staff.
• Upgraded and moved computer labs – we installed new computers in Pickett 110 and replaced the aging computers in Library 108 with the computers from Pickett 214. This work was done in accordance with the college plan to reduce the total number of computer labs down to two. Both computer labs (P214 and L108) now have dual monitors at every station and Pickett 214, now empty, will have work done this fall to install power around the classroom on the desks to better support our Bring Your Own Device (BYOD) initiative. All of the classroom spaces now have strong wireless in support of BYOD.
• Assisted upgrading features for our Great Plains finance software which will improve operations and reporting for the campus.
• Installing Titanium EMR (Electronic Medical Records) Software for use by the Student Counseling Center. This software provides support for the department in their business operations and storage of their medical records.
• Finalizing the cleanup of loose and messy wires in the library computer spaces.
• Ordered replacement computers for qualified faculty and staff (laptops older than 4 years, desktops older than 5 years are being replaced as per college policy) and the team will be preparing and rolling them out this fall and winter.
• Completed the college dorm room Wi-Fi installations by installing in-wall access points in Livermore.
• Wireless access points are scheduled to be installed in the newly renovated student center.
• Provided support for Conference Services in hosting and configuring the new room reservation software.
• Partnering with the Student Affairs department, we met with the RA’s to provide training to help field technology questions and issues that may arise with students.
• Checked all of the dorms and classroom spaces prior to the start of the fall semester to ensure everything is working well. We found a few issues that need resolution and a few easy but meaningful opportunities for improvements. I’ll be sending a separate email with more details.
• We have provided updates to our website which includes support documents and instructions on how to let us know if you need help.

Spring 2017 IT Update - 3/28/2017
Provide Excellent Customer Service
• The Helpdesk has been busy and very productive, resolving your issues on average within 21 hours – Since January 1 we have:
• Resolved 476 reported incidents
• Answered an estimated 543 phone calls
• Responded to an estimated 944 emails
• Helped an estimated 319 walk-in customers

The Helpdesk staff also created an updated student worker training guide and incident response procedure to help ensure you are provided with the best customer service possible.

Mitigate Risk and Improve Network, Systems, and Data Security
• Created two new encrypted wireless networks for IT employees and all other managers utilizing information technology to manage Paul Smith’s College systems. This increases security while maintaining an easy to use, open wireless network for all other wireless users.
• Implemented network Access Control Lists (ACLs) and industry leading best practices to protect critical Paul Smith’s College systems from well-known vulnerabilities. In addition, these ACLs allow only authorized IT members access to these systems.
• Optimized, verified and stabilized our server backups – this better prepares us for unforeseen events and allows us to best prepare for a disaster recovery solution to restore critical IT systems in the event of a large scale disaster.
• Replacing aging server room uninterrupted power supply infrastructure.

Adding Valuable Services for Students, Faculty and Staff.
• Installed ~75 new wireless access points in classrooms to allow full classes to have a better experience when using their wireless devices.
• Performed a major upgrade to our Student Information System – PowerCampus/Self-Service.
• Completed a campus-wide computer inventory in preparation for replacing aging computers on campus.
• Created new servers for counseling center software and a campus data management server.
• Implemented wireless network features (“Air Time Fairness”, “Band Steering”) to improve performance for wireless devices.

Winter 2017 IT Update 1/16/2017
The Short Version:
We have been working on adding over 100 wireless access points to classroom spaces, completed tests of technology in our classrooms (1 issue found), patched our servers with security updates, updated our server backup configurations, tightened security on our network, added redundancy to some of our critical systems, upgraded our IT help desk software, proposed policy changes, and moved towards completion of (a) a major PowerCampus upgrade, (b) conference services room schedule web server installation, (c) and scheduled demos for a book store Point of Sale system. Additionally, we updated software in some computer labs, pushed out some faculty and staff computers, worked on completing a computer hardware inventory, and are having USB and outlet power installed in the Cantwell 101 computer lab to prepare for mobile access…and we worked to answer all of your calls, emails, and walk-in questions.

The Long Version:
Network:
• We are adding over 100 wireless access points to classrooms accommodate classroom capacity and give users a more consistent and better experience when using mobile devices. As of last Friday, the electricians had finished installing the necessary network wiring in all of the rooms and we are busy installing the access points. So far Cantwell and Saratoga are complete and the other classrooms will be coming online in the coming weeks. I will provide an update when the project is complete.
• We are improving our tracking, configuration and redundancy of our network assets by adding the devices MAC addresses to the DHCP reservations and adding the devices to our inventory spreadsheet.
• We are actively planning the work required to tighten some of our network security configurations and policies to limit access to critical systems by outsiders.

Classroom Spaces:
• Each of our 42 classrooms was inspected for a 9 point hardware check. We found 1 outstanding issue that we are working to resolve – Cantwell 217 is experiencing a pink hue on the projector.
• We performed software upgrades in Library 108

Servers:
• We performed security updates on our windows servers.
• We implemented a backup DNS server to work in case of failure of our primary DNS server. DNS is critical software that enables users to log into our network and access the internet.
• Our new Systems Administrator spend some time verifying that our server backup system is functional and configured correctly.

Software:
• We upgraded our helpdesk software making our processing of incidents much more efficient and making the creation of a ticket much easier for you, our customer. From now on sending an email to helpdesk@paulsmiths.edu will automatically generate a ticket in our system. To ensure the best service, please do not email us individually but rather use this email address. It ensures your issue will not slip through the cracks in the midst of our overflowing inboxes.
• We are working to complete a major upgrade to Ellucian Powercampus, our student information system. This is a major technical project spanning several months and involving the coordination of many departments on campus for planning, implementation, testing and verification of data, and resolution. Major progress has been made on this project to keep it on time and on budget and it is scheduled to be complete in February.
• We have completed our responsibilities for the implementation of an upgrade to our new room scheduling software (KxSoftware).
• We are working with the bookstore and the marketing department to implement a point of sale system for our retail operations – a multi-month project plan. The team completed an RFP this fall and saw demonstrations from a variety of vendors in January. Final selection and implementation is tentatively schedule for the spring semester.

Administration
• We submitted a proposal to the college for improving our hardware replacement process on campus in the most efficient and predictable way.
• The IT department is conducting a thorough inventory of our computer assets.
• We worked on preparing and allocating computer replacements for some faculty/staff as part of an ongoing project.
• We are hiring a new IT Operations Manager to fill the role Stacie Hurwitch had.

And we enjoyed our holiday break. On behalf of the Information Technology Team at Paul Smith’s College, welcome back and we hope you have a great semester.

Still have questions?
We want to provide great service so please let us know if you are having any issues or need help.
1. Ask us in person. We’re located in the first floor of the library – Room 112
2. Email your issue to helpdesk@paulsmiths.edu
3. Contact us via phone at (518)327-6465
4. Submit a support ticket to us via the web: http://helpdesk.paulsmiths.edu/Login.jsp